Monday, January 28, 2013

Serious demolition time!

While J the carpenter has been busy putting down the flooring in the new part, Trev has had a full on couple of days pulling apart the back end of the house. It's hard work and he's exhausted, but I think he secretly likes smashing stuff with a sledge hammer and crow bar lol.
IMG_1023
This view is standing in our bedroom and looking through the two other bedrooms!
At some stage, a false ceiling was put in the kitchen and the bedroom. The ceiling in our bedroom has also been lowered, but thankfully they hadn't lowered the entry or lounge.
IMG_1013
First look in. Kind of like going into a cave for the first time ;)
IMG_1011
View of same area after the false ceiling lining was pulled off.
IMG_1002
The corner of the ceiling in the rear bedroom. I really do think that the ceiling was lowered in the kitchen and middle bedroom to make the heights uniform through the back end of the house.
IMG_1009
The bathdry has also been pulled to bits. View here is from the kitchen!

No comments:

Post a Comment